CWjobs.co.uk

Welcome to CWJobs jobseeker   Register   or   Sign in    0 Saved jobs

10,380 ads for IT jobs from 783 companies

Case Study: J.R. Simplot Data Center Refurbishment

Case Study Published By: Raritan Inc.
Raritan Inc.
Published:  Aug 04, 2010
Type:  Case Study
Length:  4 pages

The J.R. Simplot data center management team wanted to improve energy efficiency to meet corporate green initiatives. They also wanted to increase IT rack density, be better able to troubleshoot equipment and put in systems to manage potential risks. This Case Study explores how they installed energy management software and intelligent rack PDUs with outlet-level power monitoring to add remote energy management, power monitoring of individual devices, environmental monitoring, and sophisticated and accurate power usage reports and analytics.



Tags : 
raritan, power, processing, energy management, data center efficiency, power management, instrumentation, green, green computing, efficiency, power load, it equipment, pts, datacenter, cooling, distributed computing, infrastructure, network architecture, network management, power and cooling

Search